Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
021.2100.USACE.NWD.NWO.W9128F Posted W9128F26RA017
Close Date:
September 3, 2026
Deadline passed
Description
No description available.
Actions
Funding Details
- Award Floor
- Not specified
- Award Ceiling
- Not specified
- Total Estimated Funding
- Not specified
- Expected Awards
- Not specified
Key Dates
- Posted
- August 4, 2026
- Closes
- September 3, 2026
- Archive Date
- March 31, 2027
Agency Information
- Agency Name
- DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST OMAHA.W071 ENDIST OMAHA
- Agency Code
- 021.2100.USACE.NWD.NWO.W9128F
- Funding Instrument
- Procurement Contract